Time Lapse Construction Video
Time lapse video for the construction of a SteelMaster prefabricated arch style steel building showing step-by-step footage of the steel building’s construction. A 35′ width x 18′ height x 40′ length metal storage building was selected for the application of general farm storage. The completion time for this SteelMaster building’s construction was just 3 days!
The video was filmed in Knotts Island, NC in September 2010.