Storage FAQ’s
Is a SteelMaster Steel Storage Building a “Do-It-Yourself” project?
You bet they are DIY buildings! Every SteelMaster Pre Engineered Storage Building features easy-to-understand, complete illustrated assembly instructions in the newly revised construction manual. Using our one-size nut and bolt system as the only fastener and precision-fit components, erecting your new SteelMaster Building is a SNAP!
Can I really put this Steel Storage Building up myself?
Absolutely! Most of our customers assemble and raise the arches to complete the construction of their SteelMaster Metal Storage Building without a contractor. Each of our Steel Buildings comes with an easy-to-read and detailed construction manual to aid in the construction of your new building. Always remember that your SteelMaster Building Specialist and our Customer Service Representatives are available should you have any questions during any phase of the assembly process.
How do I put the Pre-Engineered Building up myself?
Step 1:
Build Your Arches – Putting up your SteelMaster Metal Storage Building is safe and easy, with 70% of the work done on the ground with only one-size nut and bolt.
Step 2:
Raise Arches – In most cases, no heavy equipment is required when raising your Steel Building.
Step 3:
Fit Arches Together – Our precision-built arches fit together perfectly. The precision overlap of the arches provides more steel at critical connections, ensuring the easiest-to-assemble, strongest, best-fitting arch system available.
Step 4:
Add End Walls – Finish your building with any SteelMaster Metal Building End Wall or add a custom garage End Wall that you create and add on yourself.
How long will it take to construct my Pre-fabricated Storage Building?
SteelMaster’s pre-cut; pre-drilled Storage Building Kits are easy to assemble. Most SteelMaster Storage Buildings can be completely assembled in a matter of just a few days.
What type of foundation is required?
Your foundation can be concrete, wood, or other materials based on your intended use. Most SteelMaster Metal Storage Building owners place their buildings on a concrete slab or footer. With our simple pre-drilled Base Connector, attaching your SteelMaster Steel Structure to foundation anchor bolts is a snap.
What about annual maintenance?
You don’t have to treat it, paint it, or maintain it. With a SteelMaster Steel Building, you just enjoy it. The Galvalume Plus coating provides years of maintenance-free use. And the rugged resilient steel will take the bumps and bangs common to a farm building.
Can I insulate a SteelMaster Agricultural Building?
The SteelMaster Pre-engineered Building design allows for just about any type of insulation. Whether you choose fiberglass rolls, spray-on insulation or rigid foam, the insulation can easily be retrofitted after your Steel Storage Building construction.
Can I run electrical wiring through my Steel Building?
Of course! Running electrical wiring is easy, although, you will probably want to have a certified electrician install your wiring unless wiring is your expertise.
How many skylights and/or vents can I put in my Metal Storage Building?
You must allow six feet of clearance from the end of the Pre-fabricated Building before placing a vent or skylight. Then the accessories can be placed every ten feet if they are staggered side to side. If you wish to not stagger the accessories you must allow 20-feet between each skylight and/or vent.
Can I put my own end walls and doors in my SteelMaster Steel Building?
Definitely! When you need to match or complement other structures, SteelMaster Storage Buildings can be customized using our Trim Kits to tie into other material such as wood, vinyl siding, even brick or block.
What will prevent condensation in my Storage Building?
All buildings produce some condensation, so make sure your building is properly ventilated to avoid any condensation inside your SteelMaster Steel Building. We offer louver and turbine vents as accessories that eliminate condensation, maximize air circulation and are easy to install.
Can I paint my Pre-Engineered Steel Building?
You can paint your SteelMaster Metal Building as you would any other type of building. However, painting isn’t required for weather protection – the aluminum + zinc surface provides that for 30 years! For more information on painting, please contact at SteelMaster Representative.
What is the best material for this type of Storage Building?
In a word – STEEL! Steel does not rot, warp, shrink or split and it is non-combustible. Structural steel is easier to handle, stronger, and less expensive than any other common Pre fabricated Storage Building materials. Steel’s inherent strength resists fire, earthquake and hurricane damage. Steel components weigh up to 60% less than wood members and all steel products are repeatedly recyclable.
Will the assembled SteelMaster Storage Building meet or exceed building loads?
Every SteelMaster Steel Building has been professionally designed and engineered to meet BOCA, UBC, and IBC loads. Also each Metal Storage Building comes with professionally engineered plans verifying that it will meet your local building loads.
Can I put in a partition in my Steel Storage Building?
Customizing the interior of your SteelMaster Metal Building is easy to do. With our clear span, truss-less design you can divide up the space in your SteelMaster steel building however you want.
How do I off-load my Pre-fabricated Building?
In order to expedite the off-loading of your SteelMaster Steel Building, you will need approximately 3-4 people to unload by hand or a piece of equipment such as a forklift, front-end loader, backhoe or boom truck. We recommend you wear gloves if unloading by hand because the panels are very sharp.
How long does it take to get my blueprints for my Metal Building?
Blueprints should be received in 3-4 weeks, once all signed agreements have been received.
Do I have to caulk my entire Pre-fabricated Building?
The quality of the SteelMaster overlap provides a virtually leak-proof building; therefore, most Steel Storage Building owners elect not to caulk their entire steel garage. Please speak with your SteelMaster Building Specialist regarding your specific application.
Can I put the Metal Storage Building on concrete or wood walls?
There are a number of options you can use for walls. Concrete, block, wood and even steel are all ways to increase the height of your SteelMaster Steel Storage Building.
Did we answer your question? If not, please click here to email our Customer Service Team.
Storage Buildings
Storage Building Specs
Feature Projects
Testimonials
- Posted in Application Extras
- 2 Comments








would it be posibble to have a commercial industrial unit shipped to the carribean and then errected.
Building would have to be around 4000 square ft and we will require office space within unit.
Thanking you in advance
Mr Winston Hodge
[
Posted by Mr Winston Hodge on March 26th, 2010 at 4:58 pm
Thank you for your post! A steel building specialist will be in contact with you soonto discuss your project.
Posted by Spike on March 29th, 2010 at 5:19 am