Is SteelMaster Buildings on the GSA schedule? Yes. Our GSA contract number is (GSA – GS07F0458T)
- What is a typical turnaround time for delivery of a pre fabricated steel building? A typical turn around from first call to delivery is standard, 4-6 weeks; however, we specialize in rapid response requests for contingency requirements and can have materials on site within two weeks.
- Can a SteelMaster Building have openings in the sides of the building? Yes, garage door openings, sliding doors, walk through doors, windows.
- Can I hang lighting and HVAC on the interior of the structure? Yes. Our engineers can design our buildings to meet the collateral load you provide.
- How can we insulate a SteelMaster building? There are several solutions including spray on and white vinyl backed insulation.
- What interior height clearance can I get on the sides of the structure? We can do many sidewall height clearances to meet your requirements.